Software Process milestone
Workplan

1. Q/A & Optimisation activity

For Q/A & Optimisation is intended here an activity which can be applied to the software product, either in a global context and within each component domain of the project.
This activity includes the following specific topics: Priority should be given to topics (a) and (b).

 This activity has to be integrated in the current Software Process and therefore based on "mutual trust" by the G4 developers and Category Coordinators.

Actions: Workplan & timescale:

2. Analysis & Design software cycle

The following list of actions proposed are meant to document a well established OOP procedure which is still required in the "production" phase of the software product. They are needed in order to assure that improvements and new developments are kept in sync with the overall OOA&D.
These actions, most of which have to be integrated in the regular software development of each project domain, if associated with a regular QA activity, will guarantee that the code quality will not degrade with time. It will also assure a coherent development where coupling will not increase with the complexity of the software.

 Process Elements:

Workplan & timescale:

3. Testing

The following is a list of actions to be considered in order to improve the System Testing activity and assure continuity. Workplan & timescale: